Not Going to be Done:
Goals 2,3 & 4. My LAQ is 2+ weeks behind on her estimate for my Spring Flowers and Shabby Strings tops and hasn't given me any indication as to when she will get to them.
If you look closely at these pictures you will see why Four Patch & Friends has stalled out once again. First I had a delay with the mail order inner border fabric, then I wasn't sure about it once it arrived and finally found the perfect fabric.
Yes, I had one of the background pieces flipped backwards. In a block in the middle of the assembled top. These kind of things I just have to set aside for awhile. And, to make the ripping especially painful, I must have been doing some paper piecing before I assembled this section because my stitches were tiny!
Will be Done:
Goals 1,5,8,10 &12. My Christmas stockings are back on track as I posted yesterday, my Star wall quilt is ready for binding, my RSC13 blocks are 80% done and my "And Sew On" block will take an afternoon. The pincushions for my HGTV swap are due by 3/31 and my day for the Stitch Me Up Embroidery Blog Hop is Wednesday, March 27th. These are fun projects!
Should be Done:
Goals 7, 9 & 11. My Nancy Halverson table runner, the Theadbias QAL table runner and my FMQ goals are all doable in the next 12 days. I just need to get serious about them.
Not on List but Done:
I finished piecing this Patriotic 9 Patch UFO yesterday and it will go on my goal list for Q2 finishes.
Bright Blue Strings is also pieced and I'll look for some backing fleece today after I take the J-cats home.
And, when I really start feeling frustrated about my lack of progress on March Goals I just open a drawer or two...It was so worth it!!! ;-) If you missed this post - click HERE. I'm linking up to WIP Wednesday@Freshly Pieced.


